1 / 26 aprilia_mille_tuono_v4_starting_upgrade1.png
previous index next

aprilia_mille_tuono_175f0d8.jpg

Sinced the V4 bikes are designed to have a small footprint many components are tightly integrated into the chassis.

Most HICAP installs take between 45 and 90 minutes.

The V4, like the Ducati 749/999 series, will take between 2 and 2.5 hours.

Path of the solenoid to starter lead down the right side of the bike.